CFD Online Logo CFD Online URL
www.cfd-online.com
[Sponsors]
Home > Forums > General Forums > Main CFD Forum

sewerconnection

Register Blogs Community New Posts Updated Threads Search

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
Old   December 31, 2011, 14:14
Default sewerconnection
  #1
New Member
 
Join Date: Aug 2011
Posts: 5
Rep Power: 14
Tutankhamun is on a distinguished road
hi i modelled a case where 2 sewerpipes flow with maximum capacity (fully filled, heavy rain maybe), were the one pipe flows in the other one (the bigger one). now i simulated it with 2 mass flow inlets so that 15 ltr comes out... 50% over maximum capacity of the pipe. but now i think it maybe not realistic... should not be a backflow/backlog there because normally there should be only 10ltr in the bigger pipe and the 5 cannot enter, or only partially... it is no extra pressure on it. that result looks like i can give as much water as i want in the channel.. only result is higher flowvelocity (Q=v*a)... but is that realistic.?






..................5 ltr
....................\
....10 ltr ______\_____ 15 ltr ?
Tutankhamun is offline   Reply With Quote

Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 09:26.