How to delay releasing the water column in dam break case?
Hi all,
I have been using interFoam for a while and now i have a small question. I tried to find old posts, but don't know the relevant keywords to do searching. Here it is: Considering a simple dam break case, I need to release the water column after a period instead of from the beginning. How to implement? Thanks in advance for any suggestion, Jing |
Specifically, can i set up a boundary condition that could be changed after a period (like remove a wall in DEM)?
|
The attachDetach mesh modifier will do what you want with the properly set trigger times.
|
Thanks a lot, Marco.
I've found some of your helpful posts. I'll learn about it soon. Jing |
All times are GMT -4. The time now is 15:08. |