Vertical Axis Savonius Turbine
Hello everybody
I'm doing a validation on the conventional vertical axis savonius turbine I take the Ct)average and multiply it to the TSR in order to get the Cp at this TSR the problem that the ct)average is very high more than 1 I dont know what is the mistake can anyone help please thanks :mad::(:confused: |
All times are GMT -4. The time now is 16:03. |