error while running
dear all,
I run my simulation in parallel by 12 core. it was run perfectly but in the middle of run I recieved the following error: [mpiexec@C-PC] ..\hydra\pm\pmiserv\pmiserv_cb.c (863): connection to proxy 0 at host C-PC failed [mpiexec@C-PC] ..\hydra\tools\demux\demux_select.c (103): callback returned error status [mpiexec@C-PC] ..\hydra\pm\pmiserv\pmiserv_pmci.c (520): error waiting for event [mpiexec@C-PC] ..\hydra\ui\mpich\mpiexec.c (1149): process manager error waiting for completion what should I do? |
Did you figure out what to do? I just got a similar error. Funny thing when running simulations is that I am never sure if its my model or if its the computer connection.
|
Quote:
I think for me it was because of internet connection. I cut off the access of software to the internet. |
All times are GMT -4. The time now is 05:40. |