what does the message mean while executing time-de
hello everybody, Happy new year! i am currently executing a time-dependent computation of a water pump with domain-scailing mode in the R/S interface. i find that after one period of computation, the task manager delivers such messages as bellow, and then begin another period of computaion. i don't know why. as it say, how can i to "SELECT THE GENERAL AZIMUTHAL AVERAGING METHOD" thank you. ************************************************
STARTS TO WRITE MID-WAY OUTPUT END MID-WAY OUTPUT SAVING TIME AVERAGED SOLUTION CREATING PITCHWISE AVERAGED OUTPUT 9 POINTS OF PATCH 2 HAVE BEEN SET TO ZERO PLEASE SELECT THE GENERAL AZIMUTHAL AVERAGING METHOD (NO DEDICATED TO AUTOGRID) IN THE NEXT COMPUTATIONS SET 2 IN THE EXPERT PARAMETER <NGRAF> (3TH ENTRY) INSTEAD OF 3 IN THE CONTROL VARIABLES PAGE ************************************************ |
All times are GMT -4. The time now is 15:50. |