How to set up an inlet within the domain
Hello all,
The case I am trying to simulate is: the noxious gas (heavier than the air)removal from an un-covered storage tank using a blower system. The blower is located outside the storage, the fresh air comes into the ventilated space through a ducting. For this case, how to set up the inlet? Thank you! |
All times are GMT -4. The time now is 00:10. |