CFD Online Logo CFD Online URL
www.cfd-online.com
[Sponsors]
Home > CFD News and Announcements > Message Display

CFD News and Announcements - Message DisplayCFD-Wiki

Post Response | Return to Index | Read Prev Msg | Read Next Msg

Mixing Tank – Scale up Your Mixing Process Like A Pro..

Posted By: pratiksha mhaske
Date:Wed, 10 Aug 2016, 2:45 p.m.

Achieve Successful Scale-ups from Lab To Production Sites

Chemists and Chemical Engineers are focused on transforming raw materials into value added products. Stirred tank is one of the widely used unit operation for these transformations. Recipes are developed in the lab and then transferred to the production units. Such differences can make scale-up from the laboratory or pilot plant challenging. Process Engineers will need to fit this recipe in an existing tank; and depending on the production site, the available configurations would change. So the same product will need to be made in tanks of various configurations and this can be challenging. Various methods are available to evolve the design/operating condition for the production scale vessel.

This webinar will deliver: - Various scale-up rules available for different batch mixing processes. - Methods to scale-up batch mixing processes from lab to pilot plant to production. - How to apply the available scale-up methods for successful scale-up's..

Achieve Successful Scale-ups from Lab To Production Sites


Post Response

Your Name:
Your Email Address:
Subject:
Message:
If you'd like to include a link to another page with your message,
please provide both the URL address and the title of the page:
Optional Link URL:
Optional Link Title:
If you'd like to include an image (picture) with your message,
please provide the URL address of the image file:
Optional Image URL:
If you'd like email notification of responses, please check this box:
 
Post Response | Return to Index | Read Prev Msg | Read Next Msg
Go to top Go to top
CFD-Wiki