|
[Sponsors] |
Verification of code : Solution and therectical values dont match |
|
LinkBack | Thread Tools | Search this Thread | Display Modes |
December 22, 2010, 06:54 |
Verification of code : Solution and therectical values dont match
|
#1 |
New Member
Vishnu Prasad
Join Date: Sep 2010
Location: Goa
Posts: 19
Rep Power: 15 |
The problem is a I beam (HE 120A Beam) clamped at both ends ( no freedom of displacement or rotation).Length is 3m.The code I wrote is the following :
/PREP7 MP,EX,1,2e11 MP,NUXY,1,0.3 ET,1,188,,,,2 SECTYPE,2,BEAM,I,IBEAM SECDATA,120e-3,120e-3,114e-3,8e-3,8e-3,5e-3 SECNUM,2 K,,0,0 K,,3,0 L,1,2 KESIZE,ALL,0.1 LMESH,ALL FINISH /SOLU NSEL,S,LOC,X,1 F,12,FY,-30e3 NSEL,S,LOC,X,0 D,1,all,0 NSEL,S,LOC,X,3 D,2,all,0 nsel,all ANTYPE,STATIC,NEW SOLVE I'm getting HUGE differences between the analysis value and theoretical value.( I used the Euler Bernoulli method to solve but even then the answers should be close by at least ). Why is this happening? Is something wrong with the code? Please help. |
|
|
|