|
[Sponsors] |
February 1, 2012, 10:33 |
Parallel Processing Problems Fluent 13
|
#1 |
New Member
Join Date: Feb 2012
Posts: 3
Rep Power: 14 |
Hello guys,
i´m workin at Technische Universität Darmstadt. Everytime the people from our chair want to calculate larger cases we have to buy processing time at our supercomputer. Well, in our students-workroom we have 10pc´s between 4 and 8 cores per engine so i would like to build-up an hpc cluster in here with Win server 2008 hpc. So far no problem. I installed one as a headnode and one as a compute node. Fluent on the headnode and the fluent installation-path shared over enterprise network (boss will give me the money for private network when i succeed with the trials), also shared a working-path. added the nodes to the cluster can see them in heat map, can run diagnosis functions without failure but won´t get connections from HN to CN over fluent. Of course i added the network paths to the fluent-launcher, chose microsoft job scheduler, ethernet and msmpi. when i choose 4 parallel processes fluent starts correctly on the local machine. if i choose 6 or 8 cores i get an "Job has been submitted. ID: 359. Waiting for CCP scheduler@headnode to start msmpi nodes ... Job 359 is Running." Fluent hangs and no reaction. can you help me to find out what fault i coud have overlooked? thank you for your answers! best regards lindsay |
|
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
FLUENT Parallel Post Processing | john_cse | FLUENT | 0 | October 20, 2011 05:49 |
Parallel running of Fluent | Bhanu Gupta | FLUENT | 3 | April 7, 2011 09:32 |
bubbly flow and parallel processing | mvee | FLUENT | 0 | September 12, 2007 05:08 |
Fluent parallel | poovanna | FLUENT | 0 | March 23, 2007 23:22 |
error parallel fluent session | Diet | FLUENT | 2 | January 27, 2005 12:31 |