|
[Sponsors] |
transient heat transfer from borehole pipe to ground |
|
LinkBack | Thread Tools | Search this Thread | Display Modes |
June 28, 2020, 01:45 |
transient heat transfer from borehole pipe to ground
|
#1 |
Member
hani mortezaee
Join Date: Sep 2014
Posts: 30
Rep Power: 11 |
hi everyone i am simulating a borehole thermal storage , 4 u pipe that are connecting to each other in series form , each of them are 42 m deep in ground (ground is cylinder in 50 m diameter and 60 meter depth ) and water flows in them , i am trying to calculate how much heat is dumped and extracted from ground in a whole year , the inlet temperature is calculated by udf from the calculated outlet temp and the building load and heat pump cop , now my question is this : since the flow in pipes are converged within 5 times steps and i want to simulate a large domain of ground in a whole year is it okay to make the time step as big as 3600 secs ?
note that my building load is hourly . |
|
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
problem in transient heat transfer of ground heat exchanger | teguhtf | FLUENT | 0 | April 23, 2020 05:46 |
Conjugate Heat Transfer in rectangular pipe with cylindrical pins | PabloXX37 | System Analysis | 0 | November 20, 2019 09:46 |
Specifying heat transfer coeff for a cylindrical pipe | Murwin12 | FLUENT | 3 | February 1, 2019 10:34 |
No Display of Heat Transfer Graphs For Double Pipe Heat Exhanger in CFX Solver | Shomaz ul Haq | CFX | 17 | November 25, 2015 22:44 |
transient source term | strakakl | OpenFOAM | 38 | November 19, 2013 01:18 |