CFD Online Logo CFD Online URL
www.cfd-online.com
[Sponsors]
Home > Forums > Software User Forums > ANSYS > FLUENT

transient heat transfer from borehole pipe to ground

Register Blogs Community New Posts Updated Threads Search

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
Old   June 28, 2020, 01:45
Default transient heat transfer from borehole pipe to ground
  #1
Member
 
hani mortezaee
Join Date: Sep 2014
Posts: 30
Rep Power: 11
h.mortezaee is on a distinguished road
hi everyone i am simulating a borehole thermal storage , 4 u pipe that are connecting to each other in series form , each of them are 42 m deep in ground (ground is cylinder in 50 m diameter and 60 meter depth ) and water flows in them , i am trying to calculate how much heat is dumped and extracted from ground in a whole year , the inlet temperature is calculated by udf from the calculated outlet temp and the building load and heat pump cop , now my question is this : since the flow in pipes are converged within 5 times steps and i want to simulate a large domain of ground in a whole year is it okay to make the time step as big as 3600 secs ?
note that my building load is hourly .
h.mortezaee is offline   Reply With Quote

Old   April 13, 2023, 07:27
Default
  #2
New Member
 
JulioSaphire
Join Date: Apr 2023
Posts: 1
Rep Power: 0
JulioSaphire is on a distinguished road
I wanted to chime in on your post about simulating a borehole thermal storage system. I don't know much about this kind of work. But now I'm applying to be an engineer, and I think that in a couple of years I'll be able to know more about this kind of work. But maybe experts will already be able to give me some advice?
JulioSaphire is offline   Reply With Quote

Old   April 18, 2023, 06:08
Default
  #3
New Member
 
LeanDeva's Avatar
 
Lean
Join Date: Apr 2023
Posts: 1
Rep Power: 0
LeanDeva is on a distinguished road
Your project sounds really interesting! I think it's great that you're trying to calculate how much heat is dumped and extracted from the ground in a whole year. I'm not an expert in thermal simulations, but I think using smaller time steps is generally advisable for more accurate results. However, I understand that simulating a large domain of ground for a whole year can be computationally expensive. You might want to look into api 8c inspection services and maybe speak to a professional. Anyway, if you've done some testing and found that a time step of 3600 seconds gives you acceptable results, then it should be okay to use it.

Last edited by LeanDeva; April 18, 2023 at 09:41.
LeanDeva is offline   Reply With Quote

Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
problem in transient heat transfer of ground heat exchanger teguhtf FLUENT 0 April 23, 2020 05:46
Conjugate Heat Transfer in rectangular pipe with cylindrical pins PabloXX37 System Analysis 0 November 20, 2019 09:46
Specifying heat transfer coeff for a cylindrical pipe Murwin12 FLUENT 3 February 1, 2019 10:34
No Display of Heat Transfer Graphs For Double Pipe Heat Exhanger in CFX Solver Shomaz ul Haq CFX 17 November 25, 2015 22:44
transient source term strakakl OpenFOAM 38 November 19, 2013 01:18


All times are GMT -4. The time now is 11:40.