March 5, 2012, 20:38 |
calculation stops and BICGStab did not converge
|
#1 |
New Member
Xiao Liu
Join Date: Mar 2012
Posts: 1
Rep Power: 0 |
When I try to run the calculation, it failed and the output is as below, who has met this problem and solved it?
BiCGStab did not converge ! * CFL 5.00000e+00 -> 5.00000e-01... BiCGStab did not converge ! A floating point exception has occurred: floating point exception [Invalid operation]. The specific cause cannot be identified. Please refer to the troubleshooting section of the User's Guide. Command: RunSimulation CompletedCommand: RunSimulation In: [Machine::main, SimulationIterator::startSimulation, SteadySolver::step] error: Server Error |
|